The Sum of the Parts
|
 |
Anders offers turnkey development and engineering services for clients that require a system that can not be bought off the shelf. The Anders Systems Division works closely with clients to evaluate their needs, to select and perfect each element of their system and then to fully integrate those elements for seamless, flawless performance.
Leveraging extensive market knowledge and experience, the Anders product development service was developed to ensure optimal performance while reducing development cost and time-to-market. Post production, Anders continues to provide technical support and advise clients on future product enhancements, helping them retain their competitive edge in the market place.
|
 |
 |
 |
 |
|
|
|
Consultation with customer
|
|
Presentation of quick initial response to customer
|
|
Customer acceptance of initial response
|
|
|
 |
 |
 |
|
|
|
Order and delivery of concept prototype system
|
|
Proof of concept achieved
|
|
|
 |
 |
 |
|
|
|
Receive customer specification
|
|
Preparation of detailed project plan
|
 |
 |
|
Costs
|
 |
 |
|
Milestones
|
 |
 |
|
Deliverables
|
|
|
Preparation of drawings or model for custom enclosure
|
|
Preparation of OS image
|
|
Preparation of specification for custom hardware
|
|
Preparation of test software and hardware jig
|
|
Customer approval of drawings, model and specifications
|
|
|
 |
 |
 |
|
|
|
Order standard and custom components
|
|
Integrate and bench test
|
|
Carry out environmental testing as necessary
|
 |
 |
|
Shock and vibration
|
 |
 |
|
Thermal
|
 |
 |
|
IP
|
|
|
Carry out approvals testing as necessary
|
|
|
|
Ship final prototype units to customer
|
|
|
 |
 |
 |
|
|
|
Obtain field trial feedback from customer
|
|
Modify design if feedback indicates necessity
|
|
Obtain customer approval for revised design
|
|
Repeat environmental and approvals tests as necessary
|
|
Prepare documentation
|
 |
 |
|
BOM
|
 |
 |
|
Build instructions
|
 |
 |
|
Operations manual
|
 |
 |
|
Data sheet library
|
 |
 |
|
Certification
|
|
|
Start scheduled production build
|
|
|
 |
 |
 |
|
|
|
Volume production
|
|
Review of assembly procedure
|
 |
 |
|
Feedback from use in field
|
|
|
Review of components used
|
 |
 |
|
Improved components available
|
 |
 |
|
EOL announced on existing components
|
|
|
Obtain customer approval for any proposed changes
|
|
Implement and test
|
|
Recertify if necessary
|
|
Change assembly procedure or component used
|
|
Update documentation
|
|
|
|
|